Calculate the cost of building an accessory dwelling unit
BEGINWhat type of unit to build?
Include separate water and gas?
If you plan to rent out your ADU, you may want the utilities on separate meters, so your tenant's utility bills will be separate from yours.
NEXTIs home located on hillside?
Construction on slopes or hillside requires additional design and site prep work, like grading the surface or providing additional support for the structure. be separate from yours.
NEXT
We estimate that your project will cost with a likely range of
Below is a detailed breakdown of this estimate. You can change the ADU details to see how the estimate changes.
Low estimate | Medium estimate | High estimate | |
Designs and permitting fees
|
$13,000 | $13,000 | $13,000 |
Structural engineering report
|
$1,000 | $1,000 | $1,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$77,350 | $91,000 | $104,650 |
Contingency
|
$15,470 | $18,200 | $20,930 |
Total cost | $107,320 | $123,700 | $140,080 |
Cost per square foot | $268 | $309 | $350 |
Low estimate | Medium estimate | High estimate | |
Designs and permitting fees
|
$15,500 | $15,500 | $15,500 |
Structural engineering report
|
$1,000 | $1,000 | $1,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$116,688 | $133,750 | $150,813 |
Contingency
|
$23,338 | $26,750 | $30,163 |
Total cost | $172,026 | $199,500 | $227,976 |
Cost per square foot | $430 | $499 | $570 |
Low estimate | Medium estimate | High estimate | |
Designs and permitting fees
|
$13,000 | $13,000 | $13,000 |
Structural engineering report
|
$1,000 | $1,000 | $1,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$97,350 | $111,000 | $124,650 |
Contingency
|
$19,470 | $22,200 | $24,930 |
Total cost | $131,320 | $147,700 | $164,080 |
Cost per square foot | $328 | $369 | $410 |
Low estimate | Medium estimate | High estimate | |
Designs and permitting fees
|
$13,000 | $13,000 | $13,000 |
Structural engineering report
|
$1,000 | $1,000 | $1,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$97,350 | $111,000 | $124,650 |
Contingency
|
$19,470 | $22,200 | $24,930 |
Total cost | $146,320 | $169,700 | $194,080 |
Cost per square foot | $366 | $424 | $485 |
Low estimate | Medium estimate | High estimate | |
Designs and permitting fees
|
$15,500 | $15,500 | $15,500 |
Structural engineering report
|
$1,000 | $1,000 | $1,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$116,688 | $133,750 | $150,813 |
Contingency
|
$23,338 | $26,750 | $30,163 |
Total cost | $157,026 | $177,500 | $197,976 |
Cost per square foot | $393 | $444 | $495 |
Low estimate | Medium estimate | High estimate | |
Designs and permitting fees
|
$15,500 | $15,500 | $15,500 |
Structural engineering report
|
$1,000 | $1,000 | $1,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$96,688 | $113,750 | $130,812 |
Contingency
|
$19,338 | $22,750 | $26,163 |
Total cost | $133,016 | $153,500 | $173,975 |
Cost per square foot | $333 | $384 | $435 |
Low estimate | Medium estimate | High estimate | |
Designs and permitting fees
|
$15,500 | $15,500 | $15,500 |
Structural engineering report
|
$1,000 | $1,000 | $1,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$96,688 | $113,750 | $130,812 |
Contingency
|
$19,338 | $22,750 | $26,163 |
Total cost | $148,026 | $175,500 | $203,975 |
Cost per square foot | $370 | $439 | $510 |
Low estimate | Medium estimate | High estimate | |
Designs and permitting fees
|
$13,000 | $13,000 | $13,000 |
Structural engineering report
|
$1,000 | $1,000 | $1,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$77,350 | $91,000 | $104,650 |
Contingency
|
$15,470 | $18,200 | $20,930 |
Total cost | $122,320 | $145,700 | $170,080 |
Cost per square foot | $306 | $364 | $425 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$14,000 | $14,000 | $14,000 |
Structural engineering report
|
$1,500 | $1,500 | $1,500 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$119,000 | $140,000 | $161,000 |
Contingency
|
$11,900 | $14,000 | $16,100 |
Total cost | $148,900 | $172,000 | $195,100 |
Cost per square foot | $372 | $430 | $488 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$16,500 | $16,500 | $16,500 |
Structural engineering report
|
$1,500 | $1,500 | $1,500 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$168,750 | $195,000 | $221,250 |
Contingency
|
$16,875 | $19,500 | $22,125 |
Total cost | $221,125 | $257,000 | $293,875 |
Cost per square foot | $553 | $643 | $735 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$14,000 | $14,000 | $14,000 |
Structural engineering report
|
$1,500 | $1,500 | $1,500 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$139,000 | $160,000 | $181,000 |
Contingency
|
$13,900 | $16,000 | $18,100 |
Total cost | $170,900 | $194,000 | $217,100 |
Cost per square foot | $427 | $485 | $543 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$14,000 | $14,000 | $14,000 |
Structural engineering report
|
$1,500 | $1,500 | $1,500 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$139,000 | $160,000 | $181,000 |
Contingency
|
$13,900 | $16,000 | $18,100 |
Total cost | $185,900 | $216,000 | $247,100 |
Cost per square foot | $465 | $540 | $618 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$16,500 | $16,500 | $16,500 |
Structural engineering report
|
$1,500 | $1,500 | $1,500 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$168,750 | $195,000 | $221,250 |
Contingency
|
$16,875 | $19,500 | $22,125 |
Total cost | $206,125 | $235,000 | $263,875 |
Cost per square foot | $515 | $588 | $660 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$16,500 | $16,500 | $16,500 |
Structural engineering report
|
$1,500 | $1,500 | $1,500 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$148,750 | $175,000 | $201,250 |
Contingency
|
$14,875 | $17,500 | $20,125 |
Total cost | $184,125 | $213,000 | $241,875 |
Cost per square foot | $460 | $533 | $605 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$16,500 | $16,500 | $16,500 |
Structural engineering report
|
$1,500 | $1,500 | $1,500 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$148,750 | $175,000 | $201,250 |
Contingency
|
$14,875 | $17,500 | $20,125 |
Total cost | $199,125 | $235,000 | $271,875 |
Cost per square foot | $498 | $588 | $680 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$14,000 | $14,000 | $14,000 |
Structural engineering report
|
$1,500 | $1,500 | $1,500 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$119,000 | $140,000 | $161,000 |
Contingency
|
$11,900 | $14,000 | $16,100 |
Total cost | $163,900 | $194,000 | $225,100 |
Cost per square foot | $410 | $485 | $563 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$15,000 | $15,000 | $15,000 |
Structural engineering report
|
$2,000 | $2,000 | $2,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$174,250 | $205,000 | $235,750 |
Contingency
|
$17,425 | $20,500 | $23,575 |
Total cost | $211,175 | $245,000 | $278,825 |
Cost per square foot | $352 | $408 | $465 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$17,500 | $17,500 | $17,500 |
Structural engineering report
|
$2,000 | $2,000 | $2,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$237,813 | $276,250 | $314,687 |
Contingency
|
$23,781 | $27,625 | $31,469 |
Total cost | $298,594 | $347,875 | $398,155 |
Cost per square foot | $498 | $580 | $664 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$15,000 | $15,000 | $15,000 |
Structural engineering report
|
$2,000 | $2,000 | $2,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$194,250 | $225,000 | $255,750 |
Contingency
|
$19,425 | $22,500 | $25,575 |
Total cost | $233,175 | $267,000 | $300,825 |
Cost per square foot | $389 | $445 | $501 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$15,000 | $15,000 | $15,000 |
Structural engineering report
|
$2,000 | $2,000 | $2,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$194,250 | $225,000 | $255,750 |
Contingency
|
$19,425 | $22,500 | $25,575 |
Total cost | $248,175 | $289,000 | $330,825 |
Cost per square foot | $414 | $482 | $551 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$17,500 | $17,500 | $17,500 |
Structural engineering report
|
$2,000 | $2,000 | $2,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$237,813 | $276,250 | $314,687 |
Contingency
|
$23,781 | $27,625 | $31,469 |
Total cost | $283,594 | $325,875 | $368,156 |
Cost per square foot | $473 | $543 | $614 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$17,500 | $17,500 | $17,500 |
Structural engineering report
|
$2,000 | $2,000 | $2,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$217,813 | $256,250 | $294,687 |
Contingency
|
$21,781 | $25,625 | $29,469 |
Total cost | $261,594 | $303,875 | $346,156 |
Cost per square foot | $436 | $506 | $577 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$17,500 | $17,500 | $17,500 |
Structural engineering report
|
$2,000 | $2,000 | $2,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$217,813 | $256,250 | $294,687 |
Contingency
|
$21,781 | $25,625 | $29,469 |
Total cost | $276,594 | $325,875 | $376,156 |
Cost per square foot | $461 | $543 | $627 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$15,000 | $15,000 | $15,000 |
Structural engineering report
|
$2,000 | $2,000 | $2,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$174,250 | $205,000 | $235,750 |
Contingency
|
$17,425 | $20,500 | $23,575 |
Total cost | $226,175 | $267,000 | $308,825 |
Cost per square foot | $377 | $445 | $515 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$16,000 | $16,000 | $16,000 |
Structural engineering report
|
$2,500 | $2,500 | $2,500 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$212,500 | $250,000 | $287,500 |
Contingency
|
$21,250 | $25,000 | $28,750 |
Total cost | $254,750 | $296,000 | $337,250 |
Cost per square foot | $340 | $395 | $450 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$18,500 | $18,500 | $18,500 |
Structural engineering report
|
$2,500 | $2,500 | $2,500 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$285,625 | $332,500 | $379,375 |
Contingency
|
$28,563 | $33,250 | $37,938 |
Total cost | $352,688 | $411,250 | $470,813 |
Cost per square foot | $470 | $548 | $628 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$16,000 | $16,000 | $16,000 |
Structural engineering report
|
$2,500 | $2,500 | $2,500 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$232,500 | $270,000 | $307,500 |
Contingency
|
$23,250 | $27,000 | $30,750 |
Total cost | $276,750 | $318,000 | $359,250 |
Cost per square foot | $369 | $424 | $479 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$16,000 | $16,000 | $16,000 |
Structural engineering report
|
$2,500 | $2,500 | $2,500 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$232,500 | $270,000 | $307,500 |
Contingency
|
$23,250 | $27,000 | $30,750 |
Total cost | $291,750 | $340,000 | $389,250 |
Cost per square foot | $389 | $453 | $519 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$18,500 | $18,500 | $18,500 |
Structural engineering report
|
$2,500 | $2,500 | $2,500 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$285,625 | $332,500 | $379,375 |
Contingency
|
$28,563 | $33,250 | $37,938 |
Total cost | $337,688 | $389,250 | $440,813 |
Cost per square foot | $450 | $519 | $588 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$18,500 | $18,500 | $18,500 |
Structural engineering report
|
$2,500 | $2,500 | $2,500 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$265,625 | $312,500 | $359,375 |
Contingency
|
$26,563 | $31,250 | $35,938 |
Total cost | $315,688 | $367,250 | $418,813 |
Cost per square foot | $421 | $490 | $558 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$18,500 | $18,500 | $18,500 |
Structural engineering report
|
$2,500 | $2,500 | $2,500 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$265,625 | $312,500 | $359,375 |
Contingency
|
$26,563 | $31,250 | $35,938 |
Total cost | $330,688 | $389,250 | $448,813 |
Cost per square foot | $441 | $519 | $598 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$16,000 | $16,000 | $16,000 |
Structural engineering report
|
$2,500 | $2,500 | $2,500 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$212,500 | $250,000 | $287,500 |
Contingency
|
$21,250 | $25,000 | $28,750 |
Total cost | $269,750 | $318,000 | $367,250 |
Cost per square foot | $360 | $424 | $490 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$18,000 | $18,000 | $18,000 |
Structural engineering report
|
$3,000 | $3,000 | $3,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$250,750 | $295,000 | $339,250 |
Contingency
|
$25,075 | $29,500 | $33,925 |
Total cost | $299,325 | $348,000 | $396,675 |
Cost per square foot | $333 | $387 | $441 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$20,500 | $20,500 | $20,500 |
Structural engineering report
|
$3,000 | $3,000 | $3,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$333,438 | $388,750 | $444,063 |
Contingency
|
$33,344 | $38,875 | $44,406 |
Total cost | $407,782 | $475,625 | $544,469 |
Cost per square foot | $453 | $528 | $605 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$18,000 | $18,000 | $18,000 |
Structural engineering report
|
$3,000 | $3,000 | $3,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$270,750 | $315,000 | $359,250 |
Contingency
|
$27,075 | $31,500 | $35,925 |
Total cost | $321,325 | $370,000 | $418,675 |
Cost per square foot | $357 | $411 | $465 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$18,000 | $18,000 | $18,000 |
Structural engineering report
|
$3,000 | $3,000 | $3,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$270,750 | $315,000 | $359,250 |
Contingency
|
$27,075 | $31,500 | $35,925 |
Total cost | $336,325 | $392,000 | $448,675 |
Cost per square foot | $374 | $436 | $499 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$20,500 | $20,500 | $20,500 |
Structural engineering report
|
$3,000 | $3,000 | $3,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$333,438 | $388,750 | $444,063 |
Contingency
|
$33,344 | $38,875 | $44,406 |
Total cost | $392,782 | $453,625 | $514,469 |
Cost per square foot | $436 | $504 | $572 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$20,500 | $20,500 | $20,500 |
Structural engineering report
|
$3,000 | $3,000 | $3,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$313,438 | $368,750 | $424,063 |
Contingency
|
$31,344 | $36,875 | $42,406 |
Total cost | $370,782 | $431,625 | $492,469 |
Cost per square foot | $412 | $480 | $547 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$20,500 | $20,500 | $20,500 |
Structural engineering report
|
$3,000 | $3,000 | $3,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$313,438 | $368,750 | $424,063 |
Contingency
|
$31,344 | $36,875 | $42,406 |
Total cost | $385,782 | $453,625 | $522,469 |
Cost per square foot | $429 | $504 | $581 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$18,000 | $18,000 | $18,000 |
Structural engineering report
|
$3,000 | $3,000 | $3,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$250,750 | $295,000 | $339,250 |
Contingency
|
$25,075 | $29,500 | $33,925 |
Total cost | $314,325 | $370,000 | $426,675 |
Cost per square foot | $349 | $411 | $474 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$18,000 | $18,000 | $18,000 |
Structural engineering report
|
$3,000 | $3,000 | $3,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$347,425 | $367,000 | $386,575 |
Contingency
|
$25,075 | $29,500 | $33,925 |
Total cost | $396,000 | $420,000 | $444,000 |
Cost per square foot | $330 | $350 | $370 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$20,500 | $20,500 | $20,500 |
Structural engineering report
|
$3,000 | $3,000 | $3,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$430,113 | $460,750 | $491,388 |
Contingency
|
$33,344 | $38,875 | $44,406 |
Total cost | $504,457 | $547,625 | $591,794 |
Cost per square foot | $420 | $456 | $493 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$18,000 | $18,000 | $18,000 |
Structural engineering report
|
$3,000 | $3,000 | $3,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$367,425 | $387,000 | $406,575 |
Contingency
|
$27,075 | $31,500 | $35,925 |
Total cost | $418,000 | $442,000 | $466,000 |
Cost per square foot | $348 | $368 | $388 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$18,000 | $18,000 | $18,000 |
Structural engineering report
|
$3,000 | $3,000 | $3,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$367,425 | $387,000 | $406,575 |
Contingency
|
$27,075 | $31,500 | $35,925 |
Total cost | $433,000 | $464,000 | $496,000 |
Cost per square foot | $361 | $387 | $413 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$20,500 | $20,500 | $20,500 |
Structural engineering report
|
$3,000 | $3,000 | $3,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$430,113 | $460,750 | $491,388 |
Contingency
|
$33,344 | $38,875 | $44,406 |
Total cost | $489,457 | $525,625 | $561,794 |
Cost per square foot | $408 | $438 | $468 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$20,500 | $20,500 | $20,500 |
Structural engineering report
|
$3,000 | $3,000 | $3,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Hard construction costs
|
$410,113 | $440,750 | $471,388 |
Contingency
|
$31,344 | $36,875 | $42,406 |
Total cost | $467,457 | $503,625 | $539,794 |
Cost per square foot | $390 | $420 | $450 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$20,500 | $20,500 | $20,500 |
Structural engineering report
|
$3,000 | $3,000 | $3,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$410,113 | $440,750 | $471,388 |
Contingency
|
$31,344 | $36,875 | $42,406 |
Total cost | $482,457 | $525,625 | $569,794 |
Cost per square foot | $402 | $438 | $475 |
Low estimate | Medium estimate | High estimate | |
Boundary survey
|
$2,000 | $2,000 | $2,000 |
Designs and permitting fees
|
$18,000 | $18,000 | $18,000 |
Structural engineering report
|
$3,000 | $3,000 | $3,000 |
Title 24 energy calculations
|
$500 | $500 | $500 |
Solar installation
|
$15,000 | $22,000 | $30,000 |
Hard construction costs
|
$347,425 | $367,000 | $386,575 |
Contingency
|
$25,075 | $29,500 | $33,925 |
Total cost | $411,000 | $442,000 | $474,000 |
Cost per square foot | $343 | $368 | $395 |
TAF Calculation
This is estimate calculation form